Conquering Lead Times In Tunnelling Projects With Clayton Locomotives
Tunnels are amongst the most difficult, demanding and complex of all engineering projects. Creating a passage through or under the ground involves a vast amount of planning, feasibility studies, cost projections and more before any ground is broken. This will involve extensive geological surveys, rock sampling, seismic studies and more. Then there is the logistical question of moving such large amounts of materials while ensuring all environmental parameters are preserved. All of which can mean that any business contemplating constructing or operating in a tunnel environment needs to be able to rely on their supply chain to keep lead times to a minimum.
As one of the UK’s leading suppliers of tunnel locomotives, Clayton Equipment prides itself on being able to offer solutions that reduce lead times for tunneling projects. This can include faster delivery times and streamlined manufacturing processes. We also offer a wide range of pre-configured options to help minimise delays. The modular design of our tunnel motor locomotive also allows for customisation without extensive lead times, which means our customers get the equipment they need, when they need it. Keep reading to discover more about how we’re able to help businesses conquer tunnel lead times.
Global manufacturing
Our established global network of suppliers ensures parts and services are readily available, allowing us to deliver our locomotives with minimal lead times. It also means we are able to offer any parts or additional equipment without significant delay, minimising downtime throughout the project lifecycle and beyond.
Innovative solutions
At Clayton Equipment, we understand how critical lead times can be in tunnelling projects which is why we offer locomotives to help you stay on schedule and within budget. But it’s more than just timely delivery. Our innovative solutions mean our train shunters and switchers can be deployed across a range of tunneling projects and construction sites across their lifespan. We can also assist in the provision of drilling machines, which are designed and manufactured to operate within a variety of parameters. These innovative solutions include fast gauge adjustments without the need for specialised tools or facilities and simplified operator controls for reduced maintenance and training costs.
Other low cost and flexible solutions include reliable system controls and the use of off the shelf components to minimise spare part lead time and maximise availability.
Tunneling case study
Our ability to meet tunneling lead time requirements is well demonstrated by our recent provision of a 500 metre long works train which was designed, built and delivered to our client. This specially commissioned train assisted in the drilling, tunnel wall and cable installation supports along the complete tunnel length of 55 km.
Whether it’s a diesel train, an underground battery locomotive or a specially commissioned train shunter for tunnelling projects, our aim at Clayton Equipment is to deliver exactly what the customer requires, on time and on budget.
Speak to an expert and discuss your tunnelling lead times or find out more about our locomotive services.
- News (100)
- Battery Locomotives (30)
- Low Emission Rail (21)
- Shunting Locomotives (10)
- Diesel Locomotives (8)
- Mining Locomotives (8)
- LocoWatch (4)
- Battery Locomotives Battery Locomotives (3)
- IoT Telematics (3)
- Case Study (2)
- Haulage (2)
- Sustainability (2)
- 90 Years (1)
- Clayton Equipment (1)
- Shunting Locomotives Shunting Locomotives (1)
- Switcher Locomotives (1)
- Telematics (1)
- June 2025 (4)
- May 2025 (1)
- April 2025 (2)
- February 2025 (1)
- January 2025 (1)
- September 2024 (1)
- August 2024 (2)
- July 2024 (2)
- June 2024 (2)
- May 2024 (1)
- April 2024 (1)
- March 2024 (1)
- February 2024 (1)
- January 2024 (4)
- November 2023 (1)
- September 2023 (1)
- August 2023 (2)
- July 2023 (2)
- June 2023 (2)
- May 2023 (2)
- March 2023 (2)
- February 2023 (3)
- January 2023 (2)
- November 2022 (2)
- October 2022 (1)
- August 2022 (1)
- July 2022 (4)
- June 2022 (1)
- May 2022 (1)
- April 2022 (2)
- March 2022 (3)
- February 2022 (8)
- January 2022 (1)
- November 2021 (3)
- October 2021 (1)
- September 2021 (3)
- August 2021 (7)
- July 2021 (7)
- June 2021 (7)
- April 2021 (1)
- January 2021 (1)
- December 2020 (2)
- August 2020 (1)
- March 2020 (4)
- February 2020 (3)
- January 2020 (4)
- December 2019 (1)
- November 2019 (2)
- October 2019 (3)
Subscribe by email
You May Also Like
These Related Stories

Battery-Powered Locomotives: The Future Of Long-Range Haulage

Clayton Hybrid Locomotives - Heavy Haulers at Tata Steel Port Talbot

No Comments Yet
Let us know what you think